This is another method of cement mortar coating outside of M.S. Pipe.This is effective method and the coating cement applied over the pipe will be good strength in service.
The weld mesh wound pipe will be fixed in machine called coating machine or coating Lathe by both end will be mounted two mandrels with proper tightening.
The machine consist ofTwo mandrel one is drive end and another is idle end.These mandrels mounted over the trolley which will move forward and reverse over a pair of rail arrangements.
The drive end mandrel will rotate constant speed and it will rotate pipe after fixing. So the pipe will rotate and move over trolley.
Ahigh speed reversely mounted bunch of steel wire brushes will have attached with two motors.These units also fitted along with the trolley which is moveable
In partnership with Cadent (formerly National Grid), we are responsible for maintaining and renewing the gas distribution network in north-west England. This includes replacing over 500km of obsolete large-diameter pipes each year. We are replacing the old cast-iron network in the historic town of Chester. In the town centre, the great majority of buildings are Grade 1 and Grade 2 listed: many are of national importance.
Integer ut faucibus ligula, at pellentesque turpis. Curabitur ac vestibulum felis. Morbi scelerisque pulvinar quam, eu auctor ante placerat et.
Curabitur eget elit non velit mattis maximus. Proin vestibulum, purus a tincidunt convallis, justo orci sollicitudin sapien, in accumsan nulla orci id ante. Vivamus at tortor turpis.
Nullam convallis odio magna, vel aliquam lacus molestie eu. Vivamus sit amet mauris leo. Praesent urna mauris, luctus in lorem nec, faucibus posuere nunc.