KEY PROJECTS OVERVIEW

Mega – Madhugiri Lift Irrigation Project (Karnataka)

The Madhugiri Lift Irrigation Project is a significant infrastructure initiative in Karnataka designed to address chronic water shortages in the drought-prone taluks of the Tumkur district. It is largely associated with the filling of tanks and irrigation projects linked to the larger Yettinahole project or similar initiatives aimed at bringing water to high-altitude areas.

  • Outside Gunniting – 2,00,000 sq. m
  • Inside Painting – 2,00,000 sq. m
  • Project Value: ₹9.2 Crores
  • project code 3178
  • Manufacturing of ms pipes from 2600 mm dia to 1700 mm dia
  • Work order no: MEIL/MADHUGIRI/3178/2019-20/2267

Mega – Bangalore Drinking Water Scheme, Kanakapura (KA)

The proposed Mekedatu balancing reservoir project near Kanakapura (approx. 90 km from Bengaluru) is a key, albeit disputed, multi-purpose initiative designed to secure drinking water for Bengaluru and Ramanagara districts, while also generating power. It aims to harness Cauvery river water, directly impacting water supply infrastructure in the surrounding regions.

  • Outside Gunniting – 3,00,000 sq. m
  •  Project Value: ₹7.2 Crores
  • Work order:MEIL/BWSSP CP-7/20-21/500.
  • 30 MM THICK CEMENT MORTAR FOR EXTERNAL SURFACE MS PIPES
    OF 3000 MM DIA BY BRUSH CAOTING MACHINE AND GUNITING
    MACHANE

PPR – Kaleshwaram Lift Irrigation Project, Telangana

The Kaleshwaram Lift Irrigation Project is divided into 7 links and 28 packages spanning a distance of approximately 500 km (310 mi) through 13 districts and utilizing a canal network of more than 1,800 km (1,100 mi).

  • Outside Gunniting – 1.75 lakh sq. m
  • Inside Painting – 1.75 lakh sq. m
  •  Project Value: ₹8.4 Crores

L&T – Garhwa Lift Irrigation Project, Jharkhand

The Garhwa Lift Irrigation Project in Jharkhand aims to enhance agricultural productivity and drought mitigation by utilizing water from the Kanhar and Sone rivers. It involves lifting water to supplement existing reservoirs through underground pipelines. Several solar-powered lift irrigation schemes are also being developed in the district, such as in Marchwar, Tewali, and Adhoura.

  • Gunniting – 2.5 lakh sq. m
  • Inside Lining – 2.5 lakh sq. m
  • Project Value: ₹14 Crores
  • Work order:L&T/Garhwa/001/22-23.

Mega – Yadagir Lift Irrigation Project, Karnataka

The Yadgir Multi-Village Drinking Water Supply Scheme in Karnataka, executed by Megha Engineering & Infrastructures Ltd (MEIL), is a major project designed to provide safe, treated drinking water to over 1.2 million people across 696 rural habitations and three urban areas (Kaka Kimi, Yadgir, Hunasagi). It lifts water from the Krishna River near the Narayanpur Dam to address chronic water scarcity.

  • Outside Gunniting – 1.3 lakh sq. m
  • Inside Painting – 1.3 lakh sq. m
  •  Project Value: ₹5 Crores

GVPR – Waghur Lift Irrigation Project, Jalgaon (MH)

The Gadegaon Branch of the Waghur Lift Irrigation Scheme in Jalgaon, Maharashtra is an innovative, pioneering project that lifts water from the Waghur Dam to irrigate 600 hectares across 10 villages. The first phase, recently inaugurated, uses a pump system and a telescopic network to supply 80 farm ponds, significantly enhancing water access for local farmers.

  • Outside Wrap Coat – 2 lakh sq. m
  • Inside Coal Tar Painting – 2 lakh sq. m
  • Project Value: ₹10.5 Crores
  • Work order:GVPREL/KILLP/WAGHUR/CIVIL
  • WORKS/25-26/W.O/48.

RVR/ROAD WORKS, ADCL, AMARAVATI,AP

Actively involved in the infrastructure development of the new capital city, Amaravati, in Andhra Pradesh, specifically working on major road projects commissioned by the Amaravati Development Corporation Limited (ADCL)

  • DI Pipes Painting – 2 lakh sq. m
  • Project Value: ₹1.8 Crores
  • WORK ORDER NO:RVR/ADCL/W.O/SITES/25-26/269

Handri-Neeva Sujala Sravanthi ( HNSS ) Project ( Kurnool-Ananthapur,AP) Project Done Through Ruthvik Constructions

The Handri-Neeva Sujala Sravanthi (HNSS) project, a critical, long-distance water transfer scheme in Andhra Pradesh's Rayalaseema region, has achieved a record by transferring over \(40\) TMC of Krishna water in 190 days. Recent works include increasing pump capacity from 1 to 12, rapid canal lining, and widening. Key Updates on Handri-Neeva Works (2025-2026):

  • The HNSS project transfers Krishna water to the drought-prone Rayalaseema region through enhanced
    pumping and canal lining works. It has crossed 40 TMC of water transfer and aims to reach 50 TMC by
    2026 for irrigation and drinking needs.
  •  Project Value: ₹10 Crores

Multiple Villa Projects, Farm Houses,Model Houses

Villas and farmhouses represent two distinct, premier, and highly desirable forms of residential property, often chosen for luxury living, vacationing, or as long-term investment options.

  • Spring Villae
  • Ayodhya Villa
  • Belmount Cream
  • Vertex Kingston Park
  • Farm Houses in Moinabad
  • Model Houses in Reputed Gated Communities